In this Department
Board/Commission/Committee
Link or Service
Projects
- Current Bids & Past Bid Tabs
- Annual Street Rehabilitation Program
- Active Projects
- Midland Trace Trail
- Completed Projects
Department Home
More Information
Find content and services related to this page.
Construction Standards
On March 14, 2012, the City of Noblesville approved revisions/modifications to the Noblesville Standards. The Noblesville Standards are construction standards, which are required for all developments. The purpose of having standards are as follows:
1. Provides for consistency amongst developments;
2. Reduces review time associated with the Technical Advisory Committee;
3. Assists Field Inspectors in observation/inspection
2. Reduces review time associated with the Technical Advisory Committee;
3. Assists Field Inspectors in observation/inspection
Copy of the drawings and ordinance are available below for downloading.
News
- Noblesville Construction Standards (Current - 2021)Revised Construction Standards 7/8/2021
- Engineering Fee Schedule and Bonding Summary (effective 2020)
- CHECKLIST: Plot Plan/Elevation Certificate
- NOBLESVILLE STANDARDS: Pervious Concrete Pavement Design RequirementsCity of Noblesville Department of Engineering Pervious Concrete Pavement Design Requirements 1.0 Overview Per...
Links of Interest
- ADA Construction and Design Requirements (FHWA & INDOT)
- INDOT Work Zone Safety Manual
- DETAIL: Sanitary Lateral Details and Notes (.PDF)
- DETAIL: Sidewalk Ramp Standard
- PLAN REQUIREMENTS: (Typical Sheets for Capital Project)
- FORM: TAC Plan Review Checklist (2014-09)
- ADVISORY: Design and Construction of Projects Affecting Waterways, A Floodway or Floodway Fringe and Potential Impacts to Wetlands
- Tree Board / Urban Forestry / Street Tree Ordinance / Arboriculture Specifications
Forms
- Guidance documents for road impact fees, sewer fees, inspection fees, project sureties (bonds), and general processes for private development
- Noblesville Construction Standards (Current - 2021)
- Engineering Fee Schedule and Bonding Summary (effective 2020)
- CHECKLIST: Plot Plan/Elevation Certificate
- NOBLESVILLE STANDARDS: Pervious Concrete Pavement Design Requirements