Corporate Campus Infrastructure Improvements (Olio Road)
*Conceptual rendering design, final design may be different*
PROJECT: Corporate Campus Infrastructure Improvements (Olio Road)
TIMELINE: Utility work and road construction began in 2020, and is expected to be substantially completed in the fall of 2021.
PROJECT GOALS: Increased safety, sewer network expansion and expanded mobility of the corridor.
OWNER: City of Noblesville
ENGINEER: BF&S
CONTRACTOR: E&B Paving and 3D Company
SCOPE: Roundabout at the intersections of Olio Road and 146th Street will replace a 2-way stop. Olio Road will be widened to 4 lanes and 146th Street will be widened to 3 lanes. A 10-foot wide asphalt path will be installed on each roadway. Project will also include sanitary sewer extension and significant storm sewer/drainage improvements.
MILEAGE: 0.9 miles
ESTIMATED COST: $9 million
COUNCIL DISTRICT: 6 (Megan Wiles)