Lift Station 8 Replacement (Oakbay)

Lift Station 8

PROJECT: Lift Station 8 Replacement (Oakbay)

TIMELINE: Construction is expected to take place from June to August 2025.

PROJECT GOALS: Replacing the existing Lift Station 8, located on Lands End Circle in Oakbay, with new pumps to increase flow limitations. Placing a prefabricated building to house the lift station to help the lift station blend in with the neighborhood. The prefabricated building will match surrounding homes. 

OWNER: Noblesville Utilities

ENGINEER: Jones & Henry

CONTRACTOR: Bynum Fanyo

SCOPE: Retrofit existing wet well, replace pumps and controls, and place prefabricated lift station building.

ESTIMATED COST: $576,163.00

COUNCIL DISTRICT: 1 (Mike Davis)